Xtlf 1510188 Repair Aa and E Storage at F527
Enid, Oklahoma
Jun 6, 2026
Posted Oct 2
Small Business
Contract Awarded
WALDROP CONSTRUCTION INC
$437K
Awarded Sep 24, 2025
Project Summary
This service will renovate building 527 to comply with UFC 04-026-01 and MIL-HNDBK 1013/1A. The building requires minor renovations to eliminate deviation request VANCE AFB 97-01. The scope of this work includes the reinforcement of the existing AA&E storage room by adding steel and plywood layers to surrounding interior walls and ceiling. Existing fixtures will be removed and reinstalled on the new wall and ceiling faces. Entry door will be replaced with a compliant door, and window fasteners will be replaced with compliant tamper-resistant fasteners. Circuits on the interior electrical panel dedicated to other areas of the facility will be relocated to a new panel outside the room, providing better access to emergency personnel. AA&E Risk Categories II through IV must be stored in a structure with a minimum forced entry resistance of 10 minutes against threat severity level III. If facility does not receive renovation, the building will not meet UFC and MIL-HNDBK code and remain potential risk of safety to the base.
Technical Details
Contracting Officer
Alexis Bishop
Contracting Officer