Repair Butler Dam
Fort Gordon, Georgia
Oct 1, 2026
Posted Sep 29
8(a) Small Disadvantaged Business
Contract Awarded
WQRI JOINT VENTURE LLC
$4.69M
Awarded Sep 29, 2025
Project Summary
THIS PROCUREMENT IS AN 8 (A) DIRECT MATCH WITH INTEGRIWARD LLC Repairs to Butler Dam - Project breakdown/Overview as follows: Operate the low-level outlet works. Remove vegetation (trees, brush, plants) from left and right embankments, auxiliary spillway concrete, emergency spillway (including the stone/rock fuse plug), stilling basin and downstream of the basin in accordance with FEMA guidelines. Reconstruct stilling basin berm so that it has a uniform shape, supports vehicle traffic to reach the other side of the dam and has a dedicated outlet structure. Remove stone/rock and debris that was deposited downstream (including the woods) south of the stilling basin. Project requirements shall include validating project scoping requirements such as topographical survey, geotechnical exploration, and hydrologic and hydraulic studies to define existing conditions and determine any upgrade and/or improvement needed to be made. Prepare design and construction for the channel and storm water network repair/improvements to properly convey the flow.
Technical Details
Contracting Officer
Tatjana Fisher
Contracting Officer